KOEFISIEN
ANALISIS HARGA SATUAN PEKERJAAN (AHSP) |
PEMBUATAN BETON |
BERDASARKAN AHSP
BIDANG PEKERJAAN UMUM TAHUN 2012 |
|
|
|
|
|
A.3. PEKERJAAN BETON (halaman 115) |
A.3.1. Koefisien
untuk AHSP pembuatan beton |
A.3.1. B.01. 1 m3 beton untuk lantai
kerja (bedding) |
|
|
No. |
Uraian |
Satuan |
Koefisien
|
|
A. |
TENAGA |
|
|
|
1 |
Pekerja |
OH |
1.200 |
2 |
Tukang Batu |
OH |
0.200 |
3 |
Kepala Tukang |
OH |
0.020 |
4 |
Mandor |
OH |
0.060 |
|
|
|
|
|
B. |
BAHAN |
|
|
|
1 |
Portland Cement |
kg |
230 (4,60 zak) |
2 |
Pasir Beton |
kg |
893 (0,638 m3) |
3 |
Batu Pecah (maks. 30
mm) |
kg |
1.027 (0,761 m3) |
4 |
Air |
liter |
215 |
|
|
|
|
|
C. |
PERALATAN |
|
|
|
|
|
|
|
|
Catatan
: Berat isi pasir beton |
1,400 |
kg/m3 |
|
Berat isi
split/kerikil |
1,350 |
kg/m3 |
|
|
|
|
|
|
A.3.1. B.02. 1 m3 beton mutu f'c = 7,4
MPa (K-100), w/c = 0,87 |
|
|
No. |
Uraian |
Satuan |
Koefisien
|
|
Manual |
Molen |
A. |
TENAGA |
|
|
|
1 |
Pekerja |
OH |
1.650 |
1.320 |
2 |
Tukang Batu |
OH |
0.275 |
0.205 |
3 |
Kepala Tukang |
OH |
0.028 |
0.020 |
4 |
Mandor |
OH |
0.083 |
0.060 |
|
|
|
|
|
B. |
BAHAN |
|
|
|
1 |
Portland Cement |
kg |
247 (4,94 zak) |
2 |
Pasir Beton |
kg |
869 (0,638 m3) |
3 |
Batu Pecah (maks. 30
mm) |
kg |
999 (0,761 m3) |
4 |
Air |
liter |
215 |
|
|
|
|
|
C. |
PERALATAN |
|
|
|
1 |
Molen 0,35 m3 |
hari |
|
0.200 |
Catatan
: Berat isi pasir beton |
1,400 |
kg/m3 |
|
Berat isi
split/kerikil |
1,350 |
kg/m3 |
|
|
|
|
|
|
A.3.1. B.03. 1 m3 beton mutu f'c = 9,8
MPa (K-125), w/c = 0,78 |
|
|
No. |
Uraian |
Satuan |
Koefisien
|
|
Manual |
Molen |
A. |
TENAGA |
|
|
|
1 |
Pekerja |
OH |
1.650 |
1.320 |
2 |
Tukang Batu |
OH |
0.275 |
0.205 |
3 |
Kepala Tukang |
OH |
0.028 |
0.020 |
4 |
Mandor |
OH |
0.083 |
0.060 |
|
|
|
|
|
B. |
BAHAN |
|
|
|
1 |
Portland Cement |
kg |
279 (5,58 zak) |
2 |
Pasir Beton |
kg |
828 (0,591 m3) |
3 |
Batu Pecah (maks. 30
mm) |
kg |
1.012 (0,750 m3) |
4 |
Air |
liter |
215 |
|
|
|
|
|
C. |
PERALATAN |
|
|
|
1 |
Molen 0,35 m3 |
hari |
|
0.200 |
Catatan
: Berat isi pasir beton |
1,400 |
kg/m3 |
|
Berat isi
split/kerikil |
1,350 |
kg/m3 |
|
|
|
|
|
|
A.3.1. B.04. 1 m3 beton mutu f'c = 12,2
MPa (K-150), w/c = 0,72 |
|
|
No. |
Uraian |
Satuan |
Koefisien
|
|
Manual |
Molen |
A. |
TENAGA |
|
|
|
1 |
Pekerja |
OH |
1.650 |
1.320 |
2 |
Tukang Batu |
OH |
0.275 |
0.205 |
3 |
Kepala Tukang |
OH |
0.028 |
0.020 |
4 |
Mandor |
OH |
0.083 |
0.060 |
|
|
|
|
|
B. |
BAHAN |
|
|
|
1 |
Portland Cement |
kg |
299 (5,98 zak) |
2 |
Pasir Beton |
kg |
799 (0,571 m3) |
3 |
Batu Pecah (maks. 30
mm) |
kg |
1.017 (0,753 m3) |
4 |
Air |
liter |
215 |
|
|
|
|
|
C. |
PERALATAN |
|
|
|
1 |
Molen 0,35 m3 |
hari |
|
0.200 |
Catatan
: Berat isi pasir beton |
1,400 |
kg/m3 |
|
Berat isi
split/kerikil |
1,350 |
kg/m3 |
|
|
|
|
|
|
A.3.1. B.05. 1 m3 beton mutu f'c = 14,5
MPa (K-175), w/c = 0,66 |
|
|
No. |
Uraian |
Satuan |
Koefisien
|
|
Manual |
Molen |
A. |
TENAGA |
|
|
|
1 |
Pekerja |
OH |
1.650 |
1.320 |
2 |
Tukang Batu |
OH |
0.275 |
0.205 |
3 |
Kepala Tukang |
OH |
0.028 |
0.020 |
4 |
Mandor |
OH |
0.083 |
0.060 |
|
|
|
|
|
B. |
BAHAN |
|
|
|
1 |
Portland Cement |
kg |
326 (6,52 zak) |
2 |
Pasir Beton |
kg |
760 (0,543 m3) |
3 |
Batu Pecah (maks. 30
mm) |
kg |
1.029 (0,762 m3) |
4 |
Air |
liter |
215 |
|
|
|
|
|
C. |
PERALATAN |
|
|
|
1 |
Molen 0,35 m3 |
hari |
|
0.200 |
Catatan
: Berat isi pasir beton |
1,400 |
kg/m3 |
|
Berat isi
split/kerikil |
1,350 |
kg/m3 |
|
|
|
|
|
|
A.3.1. B.06. 1 m3 beton mutu f'c = 16,9
MPa (K-200), w/c = 0,61 |
|
|
No. |
Uraian |
Satuan |
Koefisien
|
|
Manual |
Molen |
A. |
TENAGA |
|
|
|
1 |
Pekerja |
OH |
1.650 |
1.320 |
2 |
Tukang Batu |
OH |
0.275 |
0.205 |
3 |
Kepala Tukang |
OH |
0.028 |
0.020 |
4 |
Mandor |
OH |
0.083 |
0.060 |
|
|
|
|
|
B. |
BAHAN |
|
|
|
1 |
Portland Cement |
kg |
352 (7,04 zak) |
2 |
Pasir Beton |
kg |
731 (0,522 m3) |
3 |
Batu Pecah (maks. 30
mm) |
kg |
1.031 (0,764 m3) |
4 |
Air |
liter |
215 |
|
|
|
|
|
C. |
PERALATAN |
|
|
|
1 |
Molen 0,35 m3 |
hari |
|
0.200 |
Catatan
: Berat isi pasir beton |
1,400 |
kg/m3 |
|
Berat isi
split/kerikil |
1,350 |
kg/m3 |
|
|
|
|
|
|
A.3.1. B.07. 1 m3 beton mutu f'c = 19,3
MPa (K-225), w/c = 0,58 |
|
|
No. |
Uraian |
Satuan |
Koefisien
|
|
Manual |
Molen |
A. |
TENAGA |
|
|
|
1 |
Pekerja |
OH |
1.650 |
1.320 |
2 |
Tukang Batu |
OH |
0.275 |
0.205 |
3 |
Kepala Tukang |
OH |
0.028 |
0.020 |
4 |
Mandor |
OH |
0.083 |
0.060 |
|
|
|
|
|
B. |
BAHAN |
|
|
|
1 |
Portland Cement |
kg |
371 (7,42 zak) |
2 |
Pasir Beton |
kg |
698 (0,499 m3) |
3 |
Batu Pecah (maks. 30
mm) |
kg |
1.047 (0,776 m3) |
4 |
Air |
liter |
215 |
|
|
|
|
|
C. |
PERALATAN |
|
|
|
1 |
Molen 0,35 m3 |
hari |
|
0.200 |
Catatan
: Berat isi pasir beton |
1,400 |
kg/m3 |
|
Berat isi
split/kerikil |
1,350 |
kg/m3 |
|
|
|
|
|
|
A.3.1. B.08. 1 m3 beton mutu f'c = 21,7
MPa (K-250), w/c = 0,56 |
|
|
No. |
Uraian |
Satuan |
Koefisien
|
|
Manual |
Molen |
A. |
TENAGA |
|
|
|
1 |
Pekerja |
OH |
1.650 |
1.320 |
2 |
Tukang Batu |
OH |
0.275 |
0.205 |
3 |
Kepala Tukang |
OH |
0.028 |
0.020 |
4 |
Mandor |
OH |
0.083 |
0.060 |
|
|
|
|
|
B. |
BAHAN |
|
|
|
1 |
Portland Cement |
kg |
384 (7,68 zak) |
2 |
Pasir Beton |
kg |
692 (0,494 m3) |
3 |
Batu Pecah (maks. 30
mm) |
kg |
1.039 (0,770 m3) |
4 |
Air |
liter |
215 |
|
|
|
|
|
C. |
PERALATAN |
|
|
|
1 |
Molen 0,35 m3 |
hari |
|
0.200 |
Catatan
: Berat isi pasir beton |
1,400 |
kg/m3 |
|
Berat isi
split/kerikil |
1,350 |
kg/m3 |
|
|
|
|
|
|
A.3.1. B.09. 1 m3 beton mutu f'c = 24,0
MPa (K-275), w/c = 0,53 |
|
|
No. |
Uraian |
Satuan |
Koefisien
|
|
Manual |
Molen |
A. |
TENAGA |
|
|
|
1 |
Pekerja |
OH |
1.650 |
1.320 |
2 |
Tukang Batu |
OH |
0.275 |
0.205 |
3 |
Kepala Tukang |
OH |
0.028 |
0.020 |
4 |
Mandor |
OH |
0.083 |
0.060 |
|
|
|
|
|
B. |
BAHAN |
|
|
|
1 |
Portland Cement |
kg |
406 (8,12 zak) |
2 |
Pasir Beton |
kg |
684 (0,489 m3) |
3 |
Batu Pecah (maks. 30
mm) |
kg |
1.026 (0,760 m3) |
4 |
Air |
liter |
215 |
|
|
|
|
|
C. |
PERALATAN |
|
|
|
1 |
Molen 0,35 m3 |
hari |
|
0.200 |
Catatan
: Berat isi pasir beton |
1,400 |
kg/m3 |
|
Berat isi
split/kerikil |
1,350 |
kg/m3 |
|
|
|
|
|
|
A.3.1. B.10. 1 m3 beton mutu f'c = 26,4
MPa (K-300), w/c = 0,52 |
|
|
No. |
Uraian |
Satuan |
Koefisien
|
|
Manual |
Molen |
A. |
TENAGA |
|
|
|
1 |
Pekerja |
OH |
1.650 |
1.320 |
2 |
Tukang Batu |
OH |
0.275 |
0.205 |
3 |
Kepala Tukang |
OH |
0.028 |
0.020 |
4 |
Mandor |
OH |
0.083 |
0.060 |
|
|
|
|
|
B. |
BAHAN |
|
|
|
1 |
Portland Cement |
kg |
413 (8,26 zak) |
2 |
Pasir Beton |
kg |
681 (0,486 m3) |
3 |
Batu Pecah (maks. 30
mm) |
kg |
1.021 (0,756 m3) |
4 |
Air |
liter |
215 |
|
|
|
|
|
C. |
PERALATAN |
|
|
|
1 |
Molen 0,35 m3 |
hari |
|
0.200 |
Catatan
: Berat isi pasir beton |
1,400 |
kg/m3 |
|
Berat isi
split/kerikil |
1,350 |
kg/m3 |
|
|
|
|
|
|
A.3.1. B.11. 1 m3 beton mutu f'c = 28,8
MPa (K-325), w/c = 0,49 |
|
|
No. |
Uraian |
Satuan |
Koefisien
|
|
Manual |
Molen |
A. |
TENAGA |
|
|
|
1 |
Pekerja |
OH |
1.650 |
1.320 |
2 |
Tukang Batu |
OH |
0.275 |
0.205 |
3 |
Kepala Tukang |
OH |
0.028 |
0.020 |
4 |
Mandor |
OH |
0.083 |
0.060 |
|
|
|
|
|
B. |
BAHAN |
|
|
|
1 |
Portland Cement |
kg |
439 (8,78 zak) |
2 |
Pasir Beton |
kg |
670 (0,479 m3) |
3 |
Batu Pecah (maks. 30
mm) |
kg |
1.006 (0,745 m3) |
4 |
Air |
liter |
215 |
|
|
|
|
|
C. |
PERALATAN |
|
|
|
1 |
Molen 0,35 m3 |
hari |
|
0.200 |
Catatan
: Berat isi pasir beton |
1,400 |
kg/m3 |
|
Berat isi
split/kerikil |
1,350 |
kg/m3 |
|
|
|
|
|
|
A.3.1. B.12. 1 m3 beton mutu f'c = 31,2
MPa (K-350), w/c = 0,48 |
|
|
No. |
Uraian |
Satuan |
Koefisien
|
|
Manual |
Molen |
A. |
TENAGA |
|
|
|
1 |
Pekerja |
OH |
1.650 |
1.320 |
2 |
Tukang Batu |
OH |
0.275 |
0.205 |
3 |
Kepala Tukang |
OH |
0.028 |
0.020 |
4 |
Mandor |
OH |
0.083 |
0.060 |
|
|
|
|
|
B. |
BAHAN |
|
|
|
1 |
Portland Cement |
kg |
448 (8,96 zak) |
2 |
Pasir Beton |
kg |
667 (0,476 m3) |
3 |
Batu Pecah (maks. 30
mm) |
kg |
1.000 (0,741 m3) |
4 |
Air |
liter |
215 |
|
|
|
|
|
C. |
PERALATAN |
|
|
|
1 |
Molen 0,35 m3 |
hari |
|
0.200 |
Catatan
: Berat isi pasir beton |
1,400 |
kg/m3 |
|
Berat isi
split/kerikil |
1,350 |
kg/m3 |
|
w/c = water/cement =
faktor air semen |
|
MPa = MegaPascal = satuan